Proper rough-in plumbing is the foundation of any reliable bathroom system. In this project, we completed full rough-in plumbing for shower areas in a multi-unit property, including installation of new drain, vent, and water supply lines.

The scope included installing shower valves, P-traps, and reconfiguring the piping layout to ensure proper alignment and code compliance. All components were securely installed and positioned to meet inspection requirements.

Rough-in work is a critical stage of construction, as it determines long-term system performance and reliability. Every connection must be precise, properly supported, and installed according to code.

This project was completed and prepared for final plumbing inspection.